Booth for a concrete plant operator
178 000 RUB
Content:
- Front wall with a window
- Back wall
- Side wall with a window
- Side wall with a door
- Roof
- Floor
- Steel angles
- Steel plate
- Corrugated tube
- Self-driving screws
- Set of flashings
Specification
Erection guidelines:
1. Place Control Unit on the Floor (#6) before erection or after it completion depending on the size of the Unit.
2. Erect the Booth around the Floor (#6)
3. Fasten Side Walls (#1, 2, 3 and 4) with the help of 6 Steel Angles (#7) for each and self-driving screws (#10).
4. Fasten Roof (#5) to Side Walls (#3 and 4) with the help of self-driving screws (#10)
5. After erection place Corrugated Tube (#9) on the Side Wall (#4).
6. Close the gaps between Walls and Roof with the help of flashings
7. Install electrical equipment after assembling the Booth.
8. Take care about power ground for electrical equipment.
Operator booth assembly diagram
Electrical interconnect diagram
1 | Front wall with a window | 1 item. |
2 | Back wall | 1 item. |
3 | Side wall with a window | 1 item. |
4 | Side wall with a door | 1 item. |
5 | Roof | 1 item. |
6 | Floor | 1 item. |
7 | Steel Angle | 12 items. |
8 | Steel Plate | 6 items. |
9 | Corrugated Tube | 1 item. |
10 | Self-Driving Screw | 144 items. |
Without drawings | battens | kit |
Erection guidelines:
1. Place Control Unit on the Floor (#6) before erection or after it completion depending on the size of the Unit.
2. Erect the Booth around the Floor (#6)
3. Fasten Side Walls (#1, 2, 3 and 4) with the help of 6 Steel Angles (#7) for each and self-driving screws (#10).
4. Fasten Roof (#5) to Side Walls (#3 and 4) with the help of self-driving screws (#10)
5. After erection place Corrugated Tube (#9) on the Side Wall (#4).
6. Close the gaps between Walls and Roof with the help of flashings
7. Install electrical equipment after assembling the Booth.
8. Take care about power ground for electrical equipment.
Operator booth assembly diagram
Electrical interconnect diagram