About factory

The factory was founded in Slatoust in 1990. The main business profile of the enterprise is manufacturing of the vibrocompression lines for production of building products and a facing stone. The factory was founded by group of the engineers having a work vast experience in defensive production.

The accumulated knowledge allowed them to design, patent and start in short terms in production the vibrocompressingunitfor production of concrete, the small piece, building products under the “Rifey” brand.

As of today, Stroytekhnika plant is acknowledged leader in manufacturing of the vibrocompressing equipment that gained recognition at prestigious international building exhibitions, the recommendation of Ministry of Constructionof the Russian Federation. The “Rifey” line, on which it is possible to produce any construction materials from the base to a box and the rooftop, was estimated not only by the small producers, but also by the large building factories.

The factory shows in the last 18 years steady increase in production. Indeed, from 2000 to 2006 the production volumes increased approximately by 25-30% a year, and in 2007 growth made 100%



History of plant

  • 1990

    In April, 1990 the first machine,"Rifey-04", for producing of a slag stone was released. It became a significant event in the history of the factory.

  • 1993

    It was started out the serial manufacturing of a more highly productive and mechanized machine "Rifey-Universal" with possibility of production already besides wall blocks also paving slabs

  • 1998

    March, 1998. Considering the consumer's wishes, the factory introduces the "Rifey-05" machine, which makes the same listed products as "Rifey-Universal" in production, but tis products cost nearly 40% cheaper

  • 2002

    It was completed a building of the inhabited town of "Stroytechnika" factory for his workers. It was also the springing up of a new administrative unit in Russia -  the "Red hill" settlement. The right for free settling in forty comfortable houses with a total area of 10 000 square meter received many of founders of "Stroytechnika" factory: managers and engineers, drivers and mechanics, welders and machine operators.

  • 2004

    In the shortest semi-annual time, from April 15 to November 15, 2004, was built the health resort of "Stroytechnika" factory in Sochi, with a total area of 1000 sq.m with numbers on 30-50 sq.m. High speed of construction was reached thanks to application of concrete stones of a special configuration. These stones were issued directly on a building site on the "Rifey" line. Thus the unique and economic technology of concreting of beams and columns without timbering was created. Now, in the years ahead, the factory workers and their families will have a beautiful vacation spot!

  • 2006

    It was built in Slatoust the unique on architectural version Bell-tower and Chapel in the name of St. Ioannes Slatoust in only 6 months, from May 12 to November 12, 2006. It was made forces and on means of Stroytechnika plant, and also on donations from private individuals. The monument to the universal Teacher, opened by the consolidated efforts and cares, became an important symbol of high spirituality and opened a new cultural milestone not only in the history of the "Red hill" settlement and the city of Slatoust, but also all Orthodoxy. Now, in the years ahead, the factory workers and their families will have a beautiful vacation spot!

  • 2007

    In the first half of the year 2007 the hi-tech automated "Rifey-Buran" complex is introduced in production

  • 2008

    It is the World economic and financial crisis. It was undertaken a number of anti-recessionary measures for mobilization of efforts for overcoming of the adverse phenomena in the production and sale environment of "Stroytechnika" factory. The first experimental models of new small-sized machines "Macho-1", and "Condor" were developed within 20 days. They were cardinally different from the predecessors and released by the compact sizes, facilitated by weight categories and by minimum prices.

  • 2009

    It was decided to create the Joint Venture  and to build the branch of the "Stroytekhnika" factory in India  after the international exhibition in 2008 in the city of Delhi. On April 13, 2009 three first sea containers with the equipment were delivered to India.

  • 2010

    The "Stroytechnika" factory becomes chiefs of the nuclear ice breaker "50th anniversary of the Victory". Expedition, involving  as a member the CEO of factory Rostov Valeriy, makes campaigns to the North and South Pole.

  • 2013

    It started  release of concrete plants "Rifey-Beton-20" and "Rifey-Beton-45", the vibrocompressing complexes with  dispensing units Rifey-Udar-SD, Rifey-Polyus-SD, Rifey-Buran-SD, universal complexes Rifey-Polyus-Beton-20, Rifey-Polyus-Beton-45.